Quick Info:
MIDI-plant
Scrap Tire Recycling

|
 |
 |
 |
 |
|
|
|
| Dirk Gerlach Engineer
|
|
|
|
|
DGE thermolysis plant MINI
- semimobile
- fully automatic
- manless operation possible
- autarc up to 3 days
- Design by DGE 2006-2012
|
 |
- Yokohama
- pilot plant for MHI
- industrial sludge
- in operation since 11/2000
- design by Dirk Gerlach 2000
|
|
Please note:
Since 2013 we offer the MIDI-plant series. A MIDI-single plant can operate the double input, by nearly same price and required space.
Possible Operation
Pilot Plant
Following features are included:
- lot of sensors for detailed test reporting
- control system with large data storage for later processing
- from the real data a real kernel can be built for furtherupscale simulation
- semimobile plant for further easy replacement
Education Plant
- same control system
- same measurement
- mostly identical units
as the larger plants type MAXI and MASTER.
Local Energy Supply
- configured feeding materials (granulate/pellets) for easy and very safety operation
- environmental friendly disposal of local production waste
- hygienisation and thermal disposal of predried (hazardous) sludges
| feeding material |
input energy |
free energy |
energy price |
operating costs |
| Scrap tire granulate (100 €/t) |
300kg/h = 2.7 MW |
oil: app. 1.3 MW carbon: app. 1.0 MW |
0.022 €/kWh (only oil) 0.013 €/kWh (oil + coke) |
0.09 €/kWh incl. financing 0.05 €/kWh |
Local allround solution
With the possibility of several feed materials you got an universal solutions for small villages of appr. 100 - 300 citizens:
- plastic waste processing for producing a storable heating energy, possible fuel for power generation
- biomass processing for producing fertilizer (ex. g. Tera Preta)
- food rest processing as waste disposal
- soil processing for cleaning the environment (ex. g. mercury contamination of gold production)
- (waste) heat for heating of green houses (food production)
|
|
|